South Huntingdon Township


Meeting Room

PERMITS AND FEES

No Lein Certifications

Requests must be in writing and include property owner(s) name(s), address,Tax Map Number,
and a stamped self addresses envelope


On-Lot Sewage Disposal Application


Land Use Permits
• Any structure 10' x 12' or 120 square feet or bigger requires a permit.
• The fee of the permit is based on the estimated cost of the structure.
• For the first $1000.00, the fee is $5.00.
• An additional $1.00 will be added for every $1000.00 beyond.

 

Subdivision Plans 

Fee $150.00
The plans need to be submitted at least one week before the monthly meeting
for it to be placed on the agenda. 



Rat Poison
Cost $15.00 per 4 pound bag    Effective 10/21/24


Water Fee
Cost   $5.00 -- 1000 gallons
Cost   $0.50 -- 100 gallons


Ewaste Collection:       October 5, 2024 from 8am to 12pm at the Municipal Building.             

Cost $50.00
Effective Sept. 21, 2017




Cost $600.00



Land Use Permit --PDF
Building Permit --PDF
(Both are required)






There is no zoning in South Huntingdon Township. No zoning permits are required.